Construction report on Kyivskyi Residential Complex

Report from the developer on the construction works performed in Kyivskyi Residential Complex as of 18.04.2025

3PC 1+2 sections

  • Installation of fencing of staircases of the first and second sections.
  • We have completed the arrangement of the internal gas supply system and installation of gas meters in the first section.
  • We started laying ceramic tiles in the common areas of the entrance group of the first and second sections.
  • We have started interior finishing works in the entrance group of the first section (plastering of walls and ceiling, installation of plasterboard boxes).
  • We are installing apartment water meters.
  • We continue to work on the facade.
1PC 6+7 sections

  • We are completing the installation of floor slabs in the seventh section.
  • We have completed the concreting of monolithic floor sections on the 2nd floor of the sixth and seventh sections.
  • Installation of staircases and landings on the second floor of the sixth and seventh sections.
  • We are carrying out works on laying load-bearing walls on the third floor of the sixth and seventh sections.

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™