1PC 6+7 sections
- Concreting works on the monolithic reinforced concrete belt of the second floor of the seventh section have been completed.
- Works on the arrangement of the ceiling of the entrance groups of the sixth and seventh sections were completed.
- Installation of floor slabs for the sixth and seventh sections has begun.
- Concreting of monolithic floor slabs on the second floor of the sixth section has begun
2PC 3+4+5 sections
- Completed the installation of monolithic sections of the seventh floor.
- We have completed the laying of the load-bearing walls of the eighth floor.
- Installation of staircases and landings on the eighth floor.
- We have completed the installation of window and door structures for commercial premises on the ground floor.
- We continue to work on the facade.
- We have completed the installation of entrance doors in the second section.
- We are working on the installation of bathrooms in the commercial premises of the first floor.
- We have installed an internal sewage system in commercial premises.