We are stepping up the pace of work in a number of apartment buildings in Kirovograd Oblast. The process of insulation of the following facilities in Oleksandriya is underway:
✔️ОСББ “Aleut” at 122 Sobornyi Ave;
✔️ОСББ “Nash Dim” at 139/1, 6th December Street;
✔️ОСББ “Nash Dim” at 139/1, 6th December Street.
The following works are being carried out in these buildings:
- A set of measures to modernize and equip the lighting system in the common areas of the building;
- A set of works on thermal insulation and arrangement of external walls;
- Replacement or repair of window blocks and balcony door blocks in apartments, insulation and glazing of existing balconies and loggias.
Rubicon Holding - building a secure future