logo
  • Company
    • About Us
    • Social responsibility
  • Projects
  • Directions
  • News
  • Contact Us
+38 066 7778030
  • en
  • ua
  1. Home
  2. News
  3. News from the construction site of the ‘Parkovy Kvartal’ residential complex

News

FEEDBACK

News from the construction site of the ‘Parkovy Kvartal’ residential complex

Construction of a modern residential complex surrounded by a pine forest, near Kyiv, is continuing. As of now, we are continuing with the following types of work:

Building 5

  • Work is underway on the installation of water supply and sewerage systems;
  • Facade work is underway;
  • Preparatory work is being carried out for the painting of individual sections of the façade.

Building 6

  • Work is continuing on the bricklaying of the 4th floor;
  • Welding work is underway to fabricate balcony frames

Building 7

  • The fabrication and installation of the foundation’s steel frames is ongoing;
  • Formwork has been installed for the concrete base.

VIDEO REVIEW

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2026

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™