Report from the developer on the construction work carried out at the ‘Parkovy Kvartal’ residential complex as at the end of September 2026.
Building 5
- We are continuing to work on the landscaping of the surrounding area;
- Work is ongoing to finalise the necessary permits for connecting the building to the external water supply, sewerage and electricity networks;
- The laying of the K1 and K2 sewerage pipes, as well as the K2K (air conditioning) pipes, has been completed – everything is fully ready for connection to the central system;
- Work has begun on installing balustrades on the balconies.
Building 6:
- Bricklaying of the 5th-floor walls is ongoing;
- Work is continuing on the fabrication and installation of steel frames for the monolithic sections.
Building 7:
- The fabrication and installation of steel frames for the monolithic cores is ongoing;
- We are continuing with the insulation work and the installation of frames and formwork for pouring the foundation slab.