Construction report of the Kyivskyi residential complex

Report from the developer on the construction works performed in Kyivskyi RC as of 17.02.2025

3 start-up complex 1+2 sections

- We have completed the installation of cement-sand screeds in the 1st and 2nd sections;

- Installation of floor electrical panels in the 1st section;

- Installation of window structures of commercial premises on the 1st floor;

- Installation of trays and laying of power cables of the 1st section to the electrical control room.

2 start-up complex 3+4+5 sections

- Completed the installation of floor slabs on the 7th floor;

- Completed the installation of monolithic floor sections of the 4th and 5th sections of the 7th floor;

- Completed work on the laying of load-bearing walls of the 8th floor of the 4th and 5th sections;

- We continue to work on the walls of the 3rd section of the 8th floor.

1 start-up complex 6+7 sections

- We have completed the arrangement of the monolithic reinforced concrete belt of the 6th section;

- Completed the installation of formwork and reinforcing cages of the monolithic reinforced concrete belt of the 7th section.

#happinessbeginswithyourownhome

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™