Construction report from Kovalivskyi residential complex

Interim report from Rubicon Holding on the work completed in the Kovalevsky residential complex as of 30 November 2025.

Section 5

  • Work is continuing on the installation of window structures and balcony blocks.
  • The monolithic belt on the 10th floor has been completed, with 95% of the floor slabs in place.
  • We are continuing to install the parapets on the 10th floor.

Section 6

  • Preparation of the second floor for the floor slab is complete.