Construction progress of the Kyivskyi residential complex

Report from the developer on construction work completed in the Kyivskyi residential complex as of 15 October 2025

Building of the 3 launch complex, sections 1 and 2

  • In section 2, interior finishing of common areas has been completed.
  • Finishing of the facade of section 1 has been completed.
  • The installation of parapet covers on the roofs of sections 1 and 2 has been completed;
  • The installation of balcony railings in sections 1 and 2 has been completed;
  • The finishing of the facade of section 2 is ongoing;
  • The landscaping of the adjacent territory near sections 1 and 2 is ongoing;
  • Installation of kerbs in the adjacent territory of sections 1 and 2 has begun.

Building of the 2 launch complex, sections 3, 4, 5

  • Insulation of the facade of section 3 has begun;
  • Installation of window and balcony structures in section 3 is being completed;
  • Installation of window structures in sections 4 and 5 is ongoing;
  • Installation of floors and all general construction work on the erection of walls, parapet walls and ventilation ducts in sections 3, 4 and 5 has been completed;
  • Concreting of parapet walls in sections 3, 4 and 5 has been completed;
  • In section 3, we are completing the masonry of interior and inter-apartment partitions:
  • Work has been completed on the insulation and installation of the roof screed in sections 4 and 5;
  • The roof of section 3 has been insulated, and the installation of the roof screed is continuing;
  • Installation of the chimney system (air/gas) in section 3 has begun.

Building of the 2 launch complex, sections 6, 7

  • Installation of floor slabs and concreting of monolithic sections in section 6 continues;
  • Bricklaying of the external and internal walls of section 7 has been resumed.

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™