Report from the developer Rubicon Holding on the construction work completed in the Kyivskyi residential complex as of 18 July 2025
3PK, sections 1 and 2
Internal work:
- Internal finishing work in section 1 has been completed.
- Finishing works in section 2 are ongoing.
Electrical works:
- Installation of floor electrical panels in section 2 has been completed.
- Installation of apartment electricity meters in both sections has begun.
Engineering systems:
- Installation and commissioning of the pumping station has been completed.
- Testing of the water supply system in both sections has been carried out.
Facade work and landscaping:
- Finishing work on the facade is ongoing.
- Waterproofing of balconies has been completed.
- Work on the gas supply system in section 2 is ongoing.
- Preparatory work for landscaping the surrounding area has begun.
2PK, sections 3, 4 and 5
Monolithic frame and masonry work:
- Final work on the masonry of the load-bearing walls of the 9th floor is ongoing.
- Installation of floor slabs on the 9th floor in sections 4 and 5 has begun.
- Work is underway on the construction of monolithic sections of the 9th floor in section 3.
- The construction of monolithic sections in sections 4 and 5 has been completed.
- The masonry of interior and inter-apartment partitions in section 3 is ongoing.
- The construction of ventilation ducts and parapet walls of the roof of section 5 has begun.
Roofing works:
- Preparatory works for the construction of the roof in sections 4 and 5 are underway.
1PK, sections 6 and 7
Monolithic works:
- Work is underway on the construction of monolithic sections of the 3rd floor ceiling in section 7.