Report from the developer Rubicon Holding on the construction work completed in the Kyivskyi residential complex as of 18 July 2025

3PK, sections 1 and 2

Internal work:

  • Internal finishing work in section 1 has been completed.
  • Finishing works in section 2 are ongoing.

Electrical works:

  • Installation of floor electrical panels in section 2 has been completed.
  • Installation of apartment electricity meters in both sections has begun.

Engineering systems:

  • Installation and commissioning of the pumping station has been completed.
  • Testing of the water supply system in both sections has been carried out.

Facade work and landscaping: ​

  • Finishing work on the facade is ongoing.
  • Waterproofing of balconies has been completed.
  • Work on the gas supply system in section 2 is ongoing.
  • Preparatory work for landscaping the surrounding area has begun.

2PK, sections 3, 4 and 5

Monolithic frame and masonry work:

  • Final work on the masonry of the load-bearing walls of the 9th floor is ongoing.
  • Installation of floor slabs on the 9th floor in sections 4 and 5 has begun.
  • Work is underway on the construction of monolithic sections of the 9th floor in section 3.
  • The construction of monolithic sections in sections 4 and 5 has been completed.
  • The masonry of interior and inter-apartment partitions in section 3 is ongoing.
  • The construction of ventilation ducts and parapet walls of the roof of section 5 has begun.

Roofing works:

  • Preparatory works for the construction of the roof in sections 4 and 5 are underway.

1PK, sections 6 and 7

Monolithic works:

  • Work is underway on the construction of monolithic sections of the 3rd floor ceiling in section 7.



Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™