Report from the developer Rubicon Holding on the construction work completed in the Kyivskyi residential complex as of 16.09.2025

Building 3PK, sections 1 and 2.

  • Interior finishing works are continuing in the second section.
  • Apartment meters are being installed in sections 1 and 2.
  • Lighting installation is also continuing in section 1.
  • Facade work and landscaping:
  • Finishing work on the facade is continuing. Work is also continuing on the installation of the gas supply system in section 2.
  • The construction fence near sections 1 and 2 has been moved and installed.
  • Work is continuing on the landscaping of the area near sections 1 and 2.

Building 2PK, sections 3, 4, 5.

  • In sections 3, 4, and 5, work on the installation of floor slabs and the arrangement of monolithic sections has been completed.
  • In section 3, work continues on the bricklaying of interior and inter-apartment partitions.
  • In sections 3, 4, and 5, the masonry of the roof parapet walls has been completed.
  • In sections 3 and 4, work continues on the masonry of ventilation ducts and the concreting of elevator shaft coverings.
  • Work continues on the installation of window structures in section 3.

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™