Construction progress in the Kovalivsky residential complex

Interim report from the developer on the work completed in the Kovalivvsky residential complex as of 30 October 2025

Section 5

  • Completion of partition walls in storage rooms on floors 8–9;
  • Reinforced belt prepared for pouring the final part of the floor slab;
  • Approximately 70% of the 10th floor area covered;
  • Installation of balcony blocks and window structures commenced.

Section 6

  • Floor slabs damaged during downtime completely dismantled;
  • All necessary slabs for the 2nd floor have been ordered;
  • The masonry of the partitions necessary for the construction of the 2nd floor has been completed;
  • The masonry of the storage rooms on the ground floor has been completed;
  • The masonry of the lift shaft has begun.

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™