The report from the developer on the construction works performed in Kyivskyi Residential Complex as of 15.07.2025.

3PC 1+2 sections

  • We are completing interior finishing works in the first and second sections.
  • We continue to work on the facade.
  • We are completing the installation of balcony fencing.
  • Installation of floor electrical panels in the 2nd section.
  • We are working on the arrangement of the water supply system for commercial premises.
  • We are installing waterproofing of balconies.

2 PC 3+4+5 sections

  • We are completing the laying of load-bearing walls on the 9th floor.
  • We have started installing floor slabs and arranging monolithic sections of the 9th floor.
  • Installation of window and balcony metal-plastic structures in the 3rd section is underway.
  • We are working on the laying of interior and inter-apartment partitions in the 3rd section.

Rubicon Holding
  • +38 066 7778030
  • KropyvnytskyiSt. Chikalenko 1A, office 425
  • office@gc-rubicon.com.ua
  • ©Rubicon Holding2025

  • Ноme
  • Company
  • Projects
  • Directions
  • News
  • Contact Us
Powered By Blade.MSP ® from BrainTEC ™