The report from the developer on the construction works performed in Kyivskyi Residential Complex as of 15.07.2025.
3PC 1+2 sections
- We are completing interior finishing works in the first and second sections.
- We continue to work on the facade.
- We are completing the installation of balcony fencing.
- Installation of floor electrical panels in the 2nd section.
- We are working on the arrangement of the water supply system for commercial premises.
- We are installing waterproofing of balconies.
2 PC 3+4+5 sections
- We are completing the laying of load-bearing walls on the 9th floor.
- We have started installing floor slabs and arranging monolithic sections of the 9th floor.
- Installation of window and balcony metal-plastic structures in the 3rd section is underway.
- We are working on the laying of interior and inter-apartment partitions in the 3rd section.