Report on construction progress at the Kovalevsky residential complex, as of 01.10.2025
Section 5
- Supply of materials: floor slabs, bricks, sand, rolled metal, and cement have been delivered and stored on site.
- Partitions: inter-apartment and intra-apartment partitions have been built on 7 floors.
- Balconies (fencing/preparation for glazing):
✔️brick fencing for 20 balconies has been completed;
✔️reinforcement of the fencing masonry has been completed in accordance with the project;
✔️preparatory work for the installation of balcony blocks and glazing has been completed.
- Storage rooms (MZK):
✔️brick partition walls of storage rooms up to and including the 8th floor have been completed;
Section 6
- Demolition: rows of silicate bricks and individual floor slabs damaged during downtime were demolished (with subsequent restoration of structural integrity).
- Load-bearing structures: construction of load-bearing walls on the 2nd floor was completed.
- Basement/plinth: masonry of storage room partitions on the plinth floor was completed.